
Explore cost calculators by service.
Electrical
Home > Calculators > Electrical Service Upgrade Cost Calculator
Use this free electrical service upgrade cost calculator to estimate what upgrading your home's electrical service costs, from a 60 or 100-amp service to 200 amps, or all the way to 400 amps for a large or all-electric home. Pick your current and new service sizes, choose overhead or underground service, and tick any extras such as trenching or surge protection. You will get a planning estimate split into equipment, electrician labor, trenching and permit costs, with budget, standard and premium levels to compare before you call an electrician.
Estimate My Service Upgrade CostService upgrade cost depends on the size you are moving to, whether your service is overhead or underground, and how much of the service entrance has to be rebuilt. A full upgrade replaces the panel, meter base, mast or riser, service conductors and grounding, and needs the utility to disconnect and reconnect your power. That is why quotes for the same 200 amps can differ by thousands.
Pick your current service size and the new size, set service type, meter location and home age, then tick any extras such as a permit allowance, trenching for an underground service, surge protection or drywall patching. Then enter your ZIP code so we can match you with local professionals if you want a firm quote. This estimate uses national planning averages, not ZIP-specific pricing.
Complete the form below to get matched with local electricians for your service upgrade.
Your result shows one headline planning estimate for a standard project, plus a typical range from the Budget total to the Premium total.
Below that you will see three cards. Budget assumes basic equipment and a lower labor rate. Standard assumes quality equipment, a licensed electrician and typical access. Premium assumes premium equipment, a specialist crew and difficult access. The breakdown shows materials, labor and other costs for the standard project, with a line-item table listing quantity, rate and subtotal for every line. Labor hours grow when the service size increases, when the service is underground, when the meter must move, and in older homes where grounding often needs updating.
Materials cover the new panel, breakers, lugs and small parts, plus a full service entrance set (meter base, mast or riser, service conductors and grounding) whenever the new service is larger than the current one. An underground service adds conduit, sweep and riser materials, homes built before 1970 carry a grounding electrode update, and a relocated meter adds conduit and feeder rerouting. Labor covers the electrician time to rebuild the service, reconnect circuits and test, adjusted for meter location and home age. Other costs can include trenching and surface restoration for an underground service, a whole-house surge protector, drywall patching and paint touch-up, and a permit and inspection allowance. Each extra is priced only when you tick it.
How much does an electrical service upgrade cost?
Published 2026 US guides put a full 100-to-200-amp service upgrade (panel, meter base, mast or riser, conductors and utility coordination) at about $2,500 to $6,500, with many contractors landing typical jobs at $3,000 to $5,000. A panel-only swap on a service that is already 200-amp capable costs less, about $1,500 to $3,000. Use the electrical service upgrade cost calculator above for a figure based on your service sizes.
How much does it cost to upgrade from 100 amps to 200 amps?
A full 100-to-200-amp upgrade runs about $2,500 to $6,500 in published 2026 ranges when the meter base and service entrance are replaced too. Underground service with new trenching pushes totals to $5,000 to $10,000 or more. The panel itself is only about $250 to $500 of that; labor and the service-entrance work carry the rest.
Does underground service cost more than overhead?
Usually, yes. An overhead service drop is straightforward, while an underground service that needs a new trench adds excavation, conduit and surface restoration, commonly $1,000 to $4,000 on top. If the existing underground conduit is in good shape and can be reused, the gap is much smaller. Tick trenching in this electrical service upgrade cost calculator to price it.
Do I need a permit for an electrical service upgrade?
Yes, in almost every jurisdiction. Service work normally needs an electrical permit, a utility disconnect and reconnect, and an inspection before power is restored. This calculator includes a permit and inspection allowance only if you tick it.
There is no single price for a service upgrade, because the total depends on the size you are moving to, whether your service is overhead or underground, and how much of the service entrance has to be rebuilt. Swapping a panel on a service that is already 200-amp capable and rebuilding a 60-amp underground service with a new trench and a relocated meter are both called service upgrades, but they are priced very differently.
Published 2026 US guides put a full 100-to-200-amp service upgrade at about $2,500 to $6,500, with typical jobs landing at $3,000 to $5,000. A panel-only swap runs about $1,500 to $3,000. Underground service with trenching pushes totals to $5,000 to $10,000 or more, and a 400-amp service for a large home runs about $5,000 to $10,000 and up. The panel itself is a small part of the bill at roughly $250 to $500 for a 200-amp load center; labor, the service entrance set and any trenching carry the rest. That spread is exactly what this electrical service upgrade cost calculator is built to untangle.
The table at the end of this article shows four example projects calculated by this tool. Use them as reference points, then run your own numbers in the calculator above.
The calculator builds your estimate from the same pieces an electrician would price. It uses planning assumptions rather than live contractor data. Your ZIP code is used only to match you with local professionals and does not change the price.
Service size: the new panel is priced by amperage (150, 200 or 400 amps), with breakers, lugs and small parts priced as a matching set. A 400-amp service costs several times a 200-amp service because the equipment and the conductors feeding it are all larger.
Service entrance: whenever the new service is bigger than the current one, this electrical service upgrade cost calculator adds a full service entrance set (meter base, mast or riser, service conductors and grounding) and extra labor hours. A same-size service renewal skips that line.
Service type: an underground service adds conduit, sweep and riser materials and more labor than an overhead drop. If the buried lateral itself must be replaced, tick trenching to add excavation, conduit and surface restoration.
Meter location and age: a meter that must move adds conduit, feeder rerouting and the most labor. Homes built before 1970 carry a grounding electrode update and a labor adjustment, because old grounding and wiring often need correction before the new service can pass inspection.
Extras: a permit allowance, trenching, whole-house surge protection and drywall patching are each added only when selected, with their own materials, equipment and labor lines.
Levels: Budget, Standard and Premium use different equipment grades and labor rates ($85, $110 and $145 per hour in this tool). They are not one number multiplied by a percentage.
New service size: 400-amp equipment costs far more than 200-amp, and 200-amp more than 150-amp.
Service entrance scope: increasing amperage means a new meter base, mast or riser and service conductors, which is where upgrade quotes jump.
Overhead vs underground: trenching a new underground lateral is one of the biggest cost drivers, especially across driveways, patios or finished landscaping.
Meter location: moving the meter to a new spot adds conduit, feeder rerouting and hours; keeping it in place is the cheapest route.
Home age: pre-1970 homes often need grounding updates and wiring corrections before the new service passes inspection.
Finish work: drywall patching, paint touch-up and yard restoration are separate lines and are often excluded from electrical quotes, so check what any quote includes.
The panel box itself is inexpensive next to the whole job. A standard 200-amp load center is roughly $250 to $500 in published guides, and even with breakers, a meter base, mast or riser and conductors the hardware for a 200-amp overhead upgrade stays around $600 to $1,200 at contractor pricing. The bill is mostly labor: coordinating the utility disconnect, rebuilding the service entrance, swapping the panel, reconnecting and labeling every circuit, and testing, plus inspection time. Underground work adds excavation on top. That is why this electrical service upgrade cost calculator prices labor by the hour and adjusts it for service type, meter location and home age.
Service upgrades almost always need an electrical permit, a utility disconnect and reconnect, and an inspection before power is restored. Fees vary widely by city and county, and many areas now require an outdoor emergency disconnect and surge protection when service equipment is replaced. Utility fees for disconnects and new service work also vary by provider. Work done without a permit can cause problems with insurance and when you sell. The calculator includes a permit and inspection allowance only if you tick it.
100-to-200-amp overhead service upgrade for EV charging, heat pumps or additions.
60-to-200-amp upgrade replacing a fuse-era service in an older home.
Underground service upgrade with a new trenched lateral and conduit.
400-amp service upgrade for large homes or all-electric conversions.
Service upgrade with a relocated meter to meet code clearances or make room for other work.
Renew the service at the same size when the equipment is damaged or obsolete but a load calculation shows the amperage is enough. Upgrade the service when the load calculation shows your current size cannot carry new loads such as an EV charger, heat pump, hot tub or addition. If you only need more breaker spaces, a subpanel may solve it for far less than a service upgrade, because spaces and capacity are different problems. If a trench is being dug for other work, running new underground conduit at the same time usually costs less than trenching twice. Ask any electrician quoting you whether the meter base, mast or riser, conductors, grounding, trenching, permit fees and drywall patching are included, since those lines explain most of the gap between quotes. Running the same job through this electrical service upgrade cost calculator first gives you a checklist to compare those quotes against.
A budget project uses basic equipment and a lower labor rate. A standard project uses quality equipment, a licensed electrician and typical access. A premium project uses premium equipment, a specialist crew and difficult access. The three levels use different equipment prices and different hourly labor rates. They are not the same number scaled by a percentage. Pick the level that matches the equipment and electrician you actually want, not just your budget.
Electrician rates vary across the United States. Dense metro areas and regions with high licensing costs generally cost more than smaller markets, and utility fees for disconnects and service work vary by provider. This calculator uses national planning averages and does not adjust the price by ZIP code, so treat the result as a starting budget and compare it with local written quotes for your service upgrade.
Current 100 amps, new 200 amps, overhead service, meter stays in place, home built 1970-1999, permit allowance included. Standard labor about 14.0 hours. Budget $1,900 – $2,400. Standard $2,650 – $3,300 (headline $2,950). Premium $3,800 – $4,700.
Current 60 amps, new 200 amps, underground service, meter stays in place, built 1970-1999, permit and trenching included. Budget $3,100 – $3,900. Standard $4,700 – $5,800 (headline $5,200). Premium $7,100 – $8,900.
Current 200 amps, new 400 amps, overhead service, meter stays in place, built before 1970, permit and whole-house surge protection included. Budget $3,500 – $4,350. Standard $5,000 – $6,300 (headline $5,600). Premium $7,300 – $9,100.
Current 100 amps, new 200 amps, underground service, meter relocated, built before 1970, permit, trenching and drywall patching included. Budget $4,550 – $5,700. Standard $6,800 – $8,500 (headline $7,600). Premium $10,200 – $12,700.
Published 2026 US guides put a full 100-to-200-amp service upgrade at about $2,500 to $6,500, with typical jobs landing at $3,000 to $5,000 when the meter base and service entrance are replaced too. A panel-only swap on a 200-amp-capable service runs about $1,500 to $3,000. This calculator prices the full service entrance set whenever the new service is bigger than the current one.
A panel upgrade swaps the panel, sometimes at the same amperage, and can keep the existing service entrance and meter. A service upgrade increases the capacity delivered to the home and also replaces the meter base, mast or riser and service conductors. A new 200-amp panel on a 100-amp service is still 100 amps of service.
Common signs are a 60 or 100-amp service, a fuse box, frequent breaker trips, dimming lights when large appliances start, or plans for an EV charger, heat pump, hot tub or addition. A load calculation by a licensed electrician confirms whether your current service size can carry the new loads.
Most overhead upgrades take one to two days, with power off for several hours on the cutover day while the utility disconnects and reconnects. Underground work with trenching can take longer. The electrician coordinates the utility disconnect, permit and inspection.
Yes, when the amperage increases. The meter base must be rated for the new service size, so a 100-to-200-amp upgrade normally includes a new meter base, mast or riser and service conductors. This calculator adds that service entrance set automatically whenever the new service is bigger than the current one.
In almost every jurisdiction, yes. Service work normally requires an electrical permit, a utility disconnect and reconnect, and an inspection before power is restored. Fees vary by city and county, so this calculator includes a permit and inspection allowance only if you select it.
Most homes do fine at 200 amps. A 400-amp service suits large homes, all-electric conversions, workshops, or homes adding several large loads at once, and it costs substantially more because the equipment and conductors are all larger. A load calculation tells you which size you actually need.
Keep the meter in the same spot if code clearances allow, since relocation and trenching are the biggest cost drivers. Reuse sound underground conduit where your utility allows it, bundle other electrical work (new circuits, surge protection) into the same visit and permit, and get at least three itemized quotes that state whether the meter base, service entrance, grounding, trenching and drywall patching are included.
Estimate the cost to upgrade or replace your breaker panel.
View calculator
Estimate the cost of outlets, lighting and remodel wiring.
View calculator
Estimate the cost to install or replace a thermostat.
View calculator
Estimate the cost to install a new HVAC system.
View calculator
Work out the right HVAC size for your home.
View calculator
Compare your planning estimate with written quotes from licensed local electricians before you commit to a budget.
This calculator provides a planning estimate only. It is not a quote, bid or guaranteed price. Actual contractor pricing may vary based on location, conditions, material choice, labor market and project complexity. Always obtain written, itemized quotes from licensed and insured professionals before committing to a budget.