Use this free whole house remodel cost calculator to estimate your budget for renovating an entire home. Enter the home size, stories and age, choose the overall scope and finish level, and add kitchens, bathrooms and systems like HVAC, electrical, plumbing and windows. You will get a planning estimate split into materials, labor, demolition, permits and allowances, with budget, standard and premium levels to compare before you call a contractor.
✓ Budget, Standard and Premium levels • ✓ Materials, labor, demolition, permits and allowances • ✓ Planning estimate, not a quote
Estimate Your RemodelLoading the whole house remodel calculator…
A whole house remodel is the largest renovation most homeowners take on. Cost depends on the size, the scope, the age of the home, how many kitchens and bathrooms you rebuild and whether you replace major systems.
Enter the home size, stories and age, choose the scope and finish level, add the kitchens and bathrooms, and tick any systems and extras. Then enter your ZIP code so we can match you with local professionals if you want a firm quote.
Your result shows one headline planning estimate for a standard project, plus a typical range from the Budget total to the Premium total.
Below that you will see three cards. Budget assumes basic-grade products and a lower labor rate. Standard assumes mainstream products and a experienced contractor. Premium assumes higher-grade products and a top-tier contractor. The line-item table lists every cost line for all three levels.
Materials cover framing, drywall, flooring, cabinets, fixtures and systems. Labor covers general and licensed trades. Demolition and disposal cover tear-out. Permits and allowances cover fees and contingency.
.
Cost depends on the size, scope, number of kitchens and baths, finish level and systems. A full gut with new systems costs far more per square foot than updating finishes.
Plan for several months, and longer for a full gut, complex permits or custom materials.
For large scopes many families move out, since dust, noise and lost kitchens and baths make living there hard.
There is no single price for whole house remodel, because the total depends on the size of the job, the products you choose, the condition of the surfaces and what your local rules require. Two homes can ask for the same work and get very different quotes.
The table at the end of this article shows four example projects calculated by this tool. Use them as reference points, then run your own numbers in the calculator above.
The calculator builds your estimate from the same pieces an contractor would price. It uses planning assumptions rather than live contractor data. Your ZIP code is used only to match you with local professionals and does not change the price. The labor market and timing you choose in Step 4 do.
Size and scope: demolition, drywall, flooring and finishes scale with your home size and the scope you choose.
Kitchens and baths: each is priced as a package of materials, labor and licensed trades, scaled by finish level.
Systems and extras: HVAC, electrical, plumbing, windows, layout change, permits and contingency are added only when selected.
Labor market and timing: Step 4 adjusts labor for a lower-cost, national-average, higher-cost or highest-cost market, and adds 15% (fast-track) or 40% (rush) to labor.
Levels: Budget, Standard and Premium use different product grades, supplier markups, labor rates and labor hours. They are not one number multiplied by a percentage.
Home size and stories: larger and taller homes cost more.
Scope: updating, major or full gut changes the total.
Kitchens and baths: they are the costliest rooms per square foot.
Systems: HVAC, wiring and plumbing add large lines.
Finish level: basic to high-end finishes differ widely.
Local labor market: contractor rates differ widely between regions.
A whole house remodel is labor-heavy because of demolition, framing, drywall finishing and multiple trades.
Finishes in kitchens and baths often drive materials, so decide on them early.
Most remodels that change structure, plumbing, electrical, mechanical systems or the footprint need a building permit and inspections. Cosmetic updates such as paint and flooring often do not. Permit fees and rules differ by city and county, and unpermitted work can cause problems when you sell or file an insurance claim. The calculator includes a permit allowance only if you tick it. Ask your contractor who pulls the permits and whether the fees are in the bid.
Updating remodel: new finishes throughout.
Major remodel: new kitchen, baths and finishes.
Full gut remodel: down to the studs with new systems.
Open-concept remodel: wall removal and beam.
Phased remodel: spreading work over time.
Remodel when the structure is sound and the location suits you. Consider a rebuild if the foundation or framing is failing, or if the cost of remodeling approaches new construction. Get a pre-remodel inspection before you commit to a large scope.
A budget project uses basic-grade products and a more cost-focused contractor. A standard project uses mainstream products with a experienced contractor. A premium project assumes higher-grade products, a higher labor rate and a top-tier contractor with a longer warranty. The three levels use different product allowances, labor rates and supplier markups. They are not the same number scaled by a percentage. Pick the level that matches the products you actually want, not just your budget.
Contractor rates and material prices vary across the United States. Dense metro areas and regions with high licensing costs generally cost more than smaller markets. The labor market setting in Step 4 gives a rough adjustment for lower-cost and higher-cost areas, but treat the result as a starting budget and compare it with local written quotes for whole house remodel.
Hire a licensed, insured general contractor for any remodel that moves walls, plumbing or electrical, or that needs permits. Smaller cosmetic updates can be done by skilled DIYers or individual trades, but structural, electrical, gas and plumbing work should be done by licensed professionals. Get at least three written, itemized bids, check licenses and insurance, ask for recent references, and agree on a payment schedule tied to finished work.
A remodel goes more smoothly when you decide early. Settle your scope, budget and must-haves before you collect bids, and choose major finishes such as cabinets, tile and fixtures before work starts, since late changes and long lead times are common sources of delay and extra cost. Ask for a written schedule and a clear change-order process.
Plan for life during construction. Decide where you will cook, bathe or sleep if a room is out of service, protect floors and furniture, and set up a dust-free path through the home. Keep a contingency of 10 to 20 percent for surprises behind walls and under floors, and keep copies of permits, warranties and product details.
What is your schedule and how are rooms phased?
How do you handle hidden problems and change orders?
Which trades do you subcontract?
Who pulls permits?
What warranty do you offer?
Get at least three written, itemized quotes for the same scope. Decide on product choices before work starts. Ask what happens if hidden problems are found, and agree on a written change-order process. Plan for trim, touch-up and cleanup work that may not be included, and keep a contingency of ten to fifteen percent for conditions that only show up once the work begins.
When you collect quotes for whole house remodel, compare the same scope, not just the bottom line. Check which products are included and who supplies them, whether the permit and inspection are in the price, what is included for patching and cleanup, and how hidden problems will be handled. A low quote that leaves out the permit, the cleanup or the finishing work can end up costing more than a higher quote that includes them.
Ask each contractor to itemize materials, labor and any allowances. If two quotes differ by a large amount, ask both to explain the difference. The calculator’s line-item table gives you a reference list of the cost lines most jobs include.
Know what you want: product type, quantity and locations.
Take photos and measurements of the area and anything that will be in the way.
Note anything unusual, such as damage, limited access or older materials.
Decide your priorities: lowest cost, longest warranty or fastest schedule.
Set aside a contingency for conditions that are only visible once work starts.
The scenarios below were produced by running this calculator with the inputs shown (planning examples at the national-average labor market and planned timing). They are not quotes, and your project will differ.
| Scenario | Budget | Standard | Premium |
|---|---|---|---|
| 2,000 sq ft major remodel (new kitchen and 2 baths, mid-range finishes) | $106,175 | $166,145 | $257,535 |
| Updating a 1,500 sq ft home (new finishes, 1 kitchen refresh and 1 bath) | $46,420 | $72,970 | $113,405 |
| Full gut of an older home (2,400 sq ft, 1950s home, new systems, windows) | $230,360 | $357,830 | $550,665 |
| High-end two-story (3,500 sq ft, high-end finishes, 2 kitchens, 4 baths) | $275,245 | $440,130 | $697,010 |
Yes. Phasing spreads the cost and keeps part of the home livable, though it can cost more overall.
For layout changes or structural work, a designer or architect can help. Many contractors also offer design-build.
It gives a planning estimate based on typical US assumptions, adjusted for the labor market and timing you choose. Real quotes depend on your site, the finishes you pick and the contractor, so treat the result as a starting budget.
Only if you tick the contingency option. Remodels often uncover hidden problems, so many homeowners keep 10 to 20 percent in reserve.
Premium assumes higher-grade finishes, a higher labor rate and a top-tier contractor. It is not a fixed markup on the standard estimate.
No. Your ZIP code is used only to match you with local professionals. The price changes with the labor market and timing you choose in Step 4.
This calculator provides a planning estimate only. It is not a quote, bid or guaranteed price. Actual contractor pricing may vary based on location, conditions, material choice, labor market and project complexity. Always obtain written, itemized quotes from licensed and insured professionals before committing to a budget.