Step 1 — Pump & Pit
1Tell us about the job

Installing more than one pump in a visit lowers the labor time for each additional pump.

Is there an existing sump pump to remove?
Sump pit (basin)

A new pit means cutting through the basement slab, digging, setting a basin with gravel and patching the concrete. It is usually the biggest single cost in a first-time installation.

Who is supplying the new pump?
Basement or crawl space access
Step 2 — New Pump
2Choose the pump type
Pump type (pump price ranges shown are planning ranges)
Power at the pit

A sump pump should plug into a GFCI-protected outlet close to the pit. Choose "no outlet" only if there is none nearby. This adds an electrician allowance.

Discharge pipe (where the water goes)

The discharge pipe carries water out of the house and away from the foundation. Choose a new line if one does not exist or cannot be reused.

Step 3 — Location & Labor Market
3Adjust for your area

Used to match you with local plumbers. It does not change the estimate.

Adjusts labor, haul-away, pit, discharge, equipment and permit allowances.

Scheduling
Step 4 — Existing Conditions & Add-ons
4Repairs & extra work
Condition of the old pump (only applies when replacing)

Old pumps can be stuck in silt or debris, and corroded fittings are harder to remove.

Add-ons (check all that apply)

Sump pump type comparison

Pump typePump price*Install effortBest forWatch out for

*Planning price range for the pump or system itself (budget to premium models), before installation. Store prices and promotions vary.